首页
关于我们
产品中心
新闻资讯
联系我们
230-4176 PUMP GP-METERING for Caterpillar 950G II Wheel LoaderProduct OverviewThis is a critical component for the steering system of Caterpillar 950G II Wheel Loaders (Serial Number range B
浏览
Interview
Select the number of specifications
打开微信分享“扫一扫” 即可分享到微信分享
详情
This is a critical component for the steering system of Caterpillar 950G II Wheel Loaders (Serial Number range BAA1-UP). The 230-4176 Pump GP-Metering is responsible for precisely controlling the hydraulic fluid flow to the steering cylinders, ensuring smooth, accurate, and reliable steering operation. Often supplied as part of the 242-7395 Lines GP-Steering assembly, this metering pump is essential for maintaining the maneuverability and safety of your heavy equipment.
Part Number: 230-4176
Component Type: Pump GP-Metering
System: Steering Hydraulic System
Applicable Machine: Caterpillar 950G II Wheel Loader
Applicable Serial Number Range: BAA1-UP
Related Assembly: Part of 242-7395 Lines GP-Steering
Function: Precise hydraulic flow control for steering
Material: Constructed with high-quality, durable materials
Superior Steering Performance: Ensures precise and smooth control, enhancing operator confidence and productivity.
Reliability: Engineered for the demanding conditions faced by wheel loaders, providing consistent performance.
Perfect Fit: Designed specifically for Caterpillar 950G II (BAA1-UP), guaranteeing direct compatibility and easy installation.
Durability: Built with robust materials for a long service life, reducing the need for frequent replacements.
Enhances Safety: A properly functioning steering system is paramount for safe operation on site.
This 230-4176 Metering Pump is specifically used in Caterpillar 950G II Wheel Loaders with serial numbers starting from BAA1-UP. The 950G II is a versatile machine deployed across various heavy-duty applications:
Construction Sites (loading, material handling)
Quarries and Mining Operations (stockpiling, truck loading)
Aggregate and Sand Plants
Waste Management Facilities
Large-Scale Agricultural Operations
Application Scenario & Case Analysis: Consider a 950G II working at a busy port, constantly moving containers or bulk materials. Efficient and precise steering is absolutely vital for navigating tight spaces and positioning the machine quickly and safely. A failing metering pump can lead to slow, jerky, or unresponsive steering, dramatically reducing the loader's operational efficiency and posing a significant safety risk to personnel and surrounding equipment. Replacing a worn or faulty 230-4176 pump ensures the loader maintains optimal performance, minimizing delays and preventing potential accidents, thereby directly impacting the facility's throughput and safety record.
Customers purchasing the 230-4176 Metering Pump may also require other components for their 950G II or related parts for similar machines:
Other parts within the 242-7395 Lines GP-Steering
Steering Cylinders & Seal Kits
Steering Control Valves
Hydraulic Hoses and Fittings for steering system
Hydraulic System Filters (Return, Case Drain, etc.)
Other Pumps for 950G II (e.g., Main Hydraulic Pump, Charge Pump)
Parts for similar Caterpillar Wheel Loaders (e.g., 960G, 972G models, check compatibility)
Installing a hydraulic metering pump requires care. Here are common issues and solutions:
Common Problem 1: Spongy, slow, or no steering after installation. Solution: Air trapped in the system. Thoroughly bleed the steering hydraulic circuit. Consult the machine's service manual for the specific bleeding procedure. This typically involves cycling the steering fully left and right multiple times with the engine running at a specific RPM.
Common Problem 2: Hydraulic fluid leaks at connections. Solution: Ensure all fittings are clean, properly seated, and tightened to the correct torque specification. Check O-rings and seals for damage before assembly and replace if necessary. Do not overtighten.
Common Problem 3: Premature pump failure shortly after replacement. Solution: Contamination is the leading cause of hydraulic component failure. Ensure the hydraulic system is completely clean before installing the new pump. Replace all associated filters and use only clean, correct-specification hydraulic fluid. Consider flushing the system if contamination is suspected.
Important: Always refer to the official Caterpillar service manual for the 950G II for detailed, step-by-step installation instructions and safety procedures specific to your machine serial number.
No comment
姓名 *
电话 *
内容
提交
询盘内容:
没有数据
姓氏 *
名字 *
邮箱 *
标题
提交表单
More Products
PREV
NEXT